Special note:

I have modified the photo gallery for the building work so that the new pictures show up at the top and you don't have to scroll down so far. 
 
Nothing else has changed.

For anyone who hasn't figured it out, the pictures you see initially are just thumbnails (albeit large ones).

If you click on them you will get a much larger picture and that picture can be further zoomed using the mouse wheel (or the equivalent finger gestures on you cell phone or tablet)

Friday, May 15, 2020

Special Message Please Read Carefully

To all Ocean Place unit owners:

Allstates is still under contract and working on renovations to Ocean Place.

With the Covid 19 Pandemic Our schedule has been pushed back.

Several unit owners have been told that there units are still under construction and the final walk-through has not been completed.

Any unit owner that decides to come down and retain back their unit before their unit has been completed will forfeit the final walk-through with the engineer and release Allstates Construction, REI and the Board from any previous or future work or liability for any damages.

We are trying hard to complete this work for you all and make this as easy as possible for a smooth transition.

Please be patient, we will get through this together.

Monday, January 6, 2020

Restoration Reports

Restoration Engineering Inc. who is managing the project as an independent consultant has been providing us with status reports and some owners have expressed interest in seeing these.

These reports can be found at the link below along with projected schedules.

Restoration Reports and Schedules